Mode 2, SMART system will be activated. The stormwater from moderate
rainfall is diverted into the bypass tunnel at the invert level (lowest segment)
of the motorway tunnel. It is worth to note that during the mode 2, the
motorway section on the upper and lower decks are still open to traffic, while
the invert level of the tunnel is filled with water