This Quote should be included :-
- Excavation and back fill.
- Outdoor pull box or hand hole.
- Receptacle outlet for IS box.
- The outdoor fitting and support shall be hot dip gal., IMC conduit. required.
- Agreed the depth of HDPE conduit have to be 400mm, follow EIT std.