The LCCs of the waste system were obtained as the sum of the
costs associated with all activities included in a scenario. The
Conventional LCC included the sum of the budget costs and transfers
for n activities involved in the scenario, as shown in Eq. (1).
The budget cost of each activity i results from multiplying the unit
budget cost of activity i (UBCi) by the amount of waste input into
the same activity (Wi). The transfer of activity i resulted from multiplying
the unit transfer of activity i (UTi) and the waste input
amount into each activity i (Wi).