The reliability was jointly assessed for all construct items by calculating the composite reliability (CR). As for the CR, which was calculated as (sum of standardised loadings)2/[(sum of standardised loadings)2 þ (sum of measurement error)], the CR of non-finance and finance performance composite reliability was calculated as 0.97
and 0.93 respectively. Additionally, the CR of the integration of infrastructure, collaboration with partners, mutual trust, planning and implementation and activation of supporting composite reliability (CR) were listed as 0.80, 0.83, 0.86, 0.85 and 0.87 respectively. The CR value exceeds 0.60 indicating an acceptable fit to the data (Fornell and Larcker 1981).