Please be informed that after our provider investigated. They found the problem came from Authority Provincial Electricity Authority (PEA) have power system issue. This issue affected to main electrical power of their node 1 had switched system to used from UPS system. After UPS feed electrical power until empty. The node was down and effected to link down.