(2) A significant relationship between percentages of removal and the hydraulic application rate (HAR) was observed. So, the highest percentages of removal were obtained in those beds with the lowest HAR (75 mm day1) and with the longest retention time (3 days). According to that finding, removal efficiency could be improved by increasing the retention time.