Lift Boom Tip with Main and Auxiliary Blocks align to the Boom Mid Section. Install Pin and Pin Keeper. Spool in excess Wire Rope until the sling supporting the Main Block and the Auxiliary Block is relaxed and the weight of the Blocks is now taken by the Hoists. Remove the sling and Bulldog clamps. De-rig slings from Boom Tip.