where hw and ew are the instrumental and phase uncertainty of the wattmeter, ha and hv are the ratio uncertainties of current (CT) and voltage (VT) transformers, and ea and ev their phase uncertainties, respectively.
If the load current exceeds the current range of the wattmeter, a current transformer must be used, even in the case of low voltages.