On 217 day of operation, the liquid-flow was resumed at the normal rate of 1 L/h. The reactor performance improved gradually and the removal efficiency was 85% after 24 h of liquid flow resumption (i.e. on 218 day of operation).
On 217 day of operation, the liquid-flow was resumed at thenormal rate of 1 L/h. The reactor performance improved graduallyand the removal efficiency was 85% after 24 h of liquid flowresumption (i.e. on 218 day of operation).