Dear Ms. Natlada,
Please find the cable schedule as attached.
Table 1 is the total number of control cables between GIS and LCC, and Table 2 is the breakdown of the same.
Table 3 is the cables between LCC and LCC.
Table 4 is the cables from LCC to Control Room or Electrical Room.
① is from GIS (in small trench) and ② is from CB operation box.
③ is the cables going to Control Room and LVAC / LVDC board.
Since the volume of ① is many, we would like to request you to change the size of small trench to W-500 x D-500.
I attached Layout of Cable Trench Rev. 1 which was added the cable routing and changed the trench size, and Section and View Rev. 1 which was changed the size of small trench.