undertake to carry out an inspection of the entire respective shipment, and reject the portion of items that do not comply with the Contract requirements. In such case, Seller shall pay all costs incurred by the Buyer for such inspection of the items. Repair or replacement of the rejected Goods shall be directed by the Buyer with the same rights and obligations outlined in sub-clause 12-4) (a) and (b) above.