the development of Terminal 3 also has an added purpose, which is to be the first operational terminal specifically built to service the gigantic airbus A380 aircraft. Bigger-than-normal baggage-handling equipment and carousels were put in place to ensure fast passenger flow, in addition to A380-specific ground-handling equipment