Heat pump
Comments
1. Cope of Spec Sender list and equipment schedule are required.
2. To specify the proposed detail in comparison table (Not only copy from left to right)
3. To highlight the back-up details in cataloger for each proposed item on Comparison table.
4. Calculation steel for the thickness of HW storage tank
5. Food grade epoxy paint should be app lied inside the HW storage tank.
6. Control wiring diagram
7. Logic diagram to show the operating sequence of the pumps.
8. Capacity test report.