SCHEDULE 1
SCOPE OF SUBCONTRACT WORKS
Scope of Work
The Scope of Work shall include the following works
1) Maintenance Workshop Building
a) Earth Works
b) Concrete Works
c) External Finishing Works
d) Internal Finishing Works
e) Door & Window Works
f) Miscellaneous Works
g) External Works
Including all related preparatory/preliminary works.
The followings are deemed to be included in the scope of the works, detailed above, where applicable:
2) All protective and temporary works and other contingent and consequential works required for the construction of the Works
3) All additional, extra or varied works as the Employer/Engineer and Main Contractor may direct for the construction completion and rectification of the Works.
4) The preparation of detailed method statement and the working drawings and their submission together with calculations, specifications and other documents for approval by statutory, or other authorities and the Employer/Engineer.
5) The detailed design of the equipment and systems and the integration of these designs into the detailed design of the Works.
6) All of material, equipment, plant, labor and other resources required for completion of the Subcontractor Work
7) All of temporary work and other works required for completion of the Subcontract Work
8) Safety, Health, Environment and Security required in the Main Contract and local regulation.
9) All of Site Expense required for the performance of the Subcontract Work
10) Remedying of losses, errors, faults or defects arising from the Subcontractor Work