I read the spec they just request the parallel function, no running 2 UPS at branch. The below information is 1 x 6K per branch,
Your information is incorrect
- UPS 3kVA = 78 Unit install 2 Unit per branch
- UPS 6kVA = 30 Unit install 1 Unit per branch Load can Rerandance N+X
- UPS 10kVA = 4 Unit install 1 Unit per Branch Load can Rerandance N+X