Are floors in production areas made from impervious material?
Are they free from cracks and open joints?
Do all production areas have adequate drainage?
Are walls sound and finished with a smooth impervious and easily cleaned material?
Are junctions between floors and walls in production areas covered?
Are window ledges sloped away from windows
How often are the premises checked for deterioration?
Is laboratory drainage separate from production drainage?