The authorized Application Analyst performs system testing in the test
environment. The system test result (J4 Document) is recorded
and kept as evidence. After the testing is completed,
the authorized Application Analyst develops the J4 document
(i.e., J4 Coversheet, Confirm system test results, Confirm total test results,
Measure load (if any), Confirm response time (if any),
Confirmation of system inspection progress control result report,
Inspection result report (summary), and Create system manual).