When the next higher lift is being erected, the lower platform shall be left in place until the next higher transoms have been installed and braced prior to receiving the next level's planking. When dismantling scaffolding, a platform shall be available to ensure that an adequate work platform is available for the scaffolders as they dismantle level by level, downward.