However, in some Japanese companies, originally there is the so-called signal kanban, which is specifically used for the batch production with high setup time. Also, several tools have been developed to reduce these times as Single-Minute Exchange of Die (SMED) by Shingo (1985), so this condition is not totally immutable; on the other hand, this difficulty remains as an open field for future research