Today when I visited our site, 22 Hotel. I could meet your new PM, Khun Witawas
and could talk with him about the water soaking problem.
And my worry about the effect to the strength against the building structure could
be solved.
Therefore, now you do not have to respond to my inquiry which I asked this morning.
But the water leakage from the roof floor which I found today is better to be closed temporarily
as the water dropping down to 8th floor, Room No. 807 which your team already knew as I saw
there was a bucket placed by your team in the room.
Your prompt action to the above work would be highly appreciated.