The layout, BPRPl-C-001, attached in the Civil Drawings of Bidding Document is only tentative and preliminary The Contractor shall arrange the buildings, equipment, road, drainage system, and other facilities by his experience with the consideration of the architectural design of existing power plant. Walkways around buildings shall be provided for normal check and maintenance access, with a minimum width of 1.50 meters reinforced concrete slab.