Dear K.Sontaya DGM and K.Sarawut Mgr.
Please see my daily report on October 6 , 2016 at BP1
1) Monitoring safety and quality at BP1 start 10.00 AM -12.00 AM
Weak point
a. Did not show tag status for process maintenance Main electric switch damage.
b. Drum cargoes did not keep at location.
c. Wooden bar and paper sheet did not orderly.
d. Paper sheet obstruct fire extinguisher.
e. Found drum cargoes layer 2 have 3 drum.
f. Utilize space for 1 drum and 1 bag/1 pallet.
g. Did not lashing belt at drum.
h. Put cargoes did not orderly.
i. Did not wrap file full.
j. Stock discrepancy and lead to mistake pick item.
k. Bag cargoes stacking crumble.
l. No base paper and mixture damaged cargoes.
All of comment I cooperated with K.Dejchai for improve.
2) Basic fire fighting
a. Cooperated with HR for name list firefighting.
b. Cooperated with Bang-prieng for request quotation.
c. Support K.Piyada for plan fire evaluation at BPC.
3) Other
a. Update master list NCR
b. Create form PDCA-NCR at BP1.
c. Set new plan to training PDCA-NCR.