We refer to Contractor’s letter no E-SLBK-8RR/TAN/248 dated June 28, 2016. The contractor requested for site survey and measurement of existing 6.6Kv switchgears, No. 9 motor control panel, No. 9 capacitor panel & No. 11 motor control panel, at Bang Khen Raw Water Pumping Station No.2 on July 15 2016 at 10.00 p.m.-4.00a.m. for re-inspection the busbar position and provision for connection between the existing panel and the new No. 9 motor control panel and No. 12 motor control panel.