The influx density can be calculated by utilizing the difference between the Shut-in Casing Pressure (SICP)and the Shut-in drill pipe pressure (SIDPP),then dividing by the vertical length of the influx,The length of influx is also refered to as the kick,measured in feet,which will be multiplied by a conversion factor of 0.052 to receive units in ppg.