Ensure that the Project Method relates to the project’s environment (i.e. if working in a financial environment, then align it with the existing management structure).
Ensure that the project’s controls are based on the project’s scale, complexity, importance, capability and risk. (Note: If there is a lot of risk in your project environment, then more time should be spent on dealing with Risk).