32.2.24. When persons are raised and lowered in
a bucket, at
the top and working level the shaft should be closed by doors
or
flaps, which should only be opened to allow the
passage of the
bucket or material.
32.2.25.
Hoisting operations in shaft sinking should be
govern-
ed by signals in conformity with the relevant requirements of
section 1.8