A bridge worker climbs the main cable above a paving crew on the self-anchored suspension span of the new Bay Bridge in San Francisco, Calif. on Friday, July 12, 2013. The road crew is spreading 8.4 million pounds of epoxy asphalt concrete to pave two 1-inch-thick layers on both decks of the new span