Install Embedded Conduit in Column or Exposed Conduit on Column Surface
Install Ground rod and Test box
Cable Pulling from Ground rod and Test Box
Install Down Conductor, Bare Copper at roof Floor Included Air Terminals
Connect all joints by Exothermic Weld Process
Visual Inspection and Measure for the ground Resistance
Inspection and Completion of Lightning Protection System Installation