In contrast, Solution III indicates that with a budget of 86 cost units, 22 bridges can be selected for retrofit, leading to a WIPW of 1.23, which is a 101% increase over the pre-retrofit WIPW of 0.61. Fig. 6 compares the network WIPW before and after the retrofit associated with Solution III when uncertainties are considered in the evaluation.