The “First Korat Wind” and “K.R. Two” projects for wind power
generation were established by Wind Energy Holding Co., Ltd. at
Huay Bong Sub-district, Dan Khun Tod District, Nakorn Ratchasima
province in 2012 and 2013, respectively. The average wind speeds
for both projects' areas are 6.2 m/s. In each project, 45 2.3 MW
wind turbines (with a total capacity 90 MW) were installed, with a
height of 99.5 m and a blade diameter of 101 m. These projects are
the first large-scale wind farms in Thailand and have the highest
capacity in Southeast Asia. Moreover, they are supported by governmental
adder subsidies of about US$0.11/kWh over 10 yr [17