Performance of the system components and control strategies were found to be satisfactory.
From simulation results the system being installed at the Aswan site consists of a 12 MW PV array coupled to a high pressure bipolar alkaline electrolyzer, rated 9.5 MW and fuel cell rated with 2MW.
The proposed method can be broadly implemented in different cases of the optimization of hybrid PV/FC power system