Diagnosis
The system established that, in the MRP view for material 2015914100 in plant 1100, the quantity structure should be selected through the production versions.
When the material was costed, entries were made for the BOM and/or routing. However, the system could not determine either a suitable or a valid production version.
System Response
The material is costed without reference to a production version.
Procedure
Check your entries for the quantity structure in the the cost estimate or for the material master.
Display Material