The reservoir canal port opera house the 1 tha ngio, tambon tha ngio District Huai yot, catch a cold on the nest.
Initiative:
His Majesty the king.
Background of the project:
The tambon tha ngio tambon Nong Chang sail and tambon Huai her. A Book of the royal building reservoir and irrigation system on 25 September 9 the singer 2532 later for a letter. รล 0005 / 3231 dated March 2533 informed the Department of 2 company that has brought the inform know through the dust of a king the baht to please me. To get reservoir project canal tha ngio as project due to initiative
Location of project
Canal head dam tha ngio is located on canal port opera in tambon Khlong tha ngio District Huai yot Changwat nutrients.
The construction period 7 years (2537 - 2543 capacity 18.50 MCM.
Objective:
1. For use as a source of water. River Valley area Kuan, glass stone, above the falls yard gate. For resources and cost of making agriculture area, about 12 700 rai. The dry and water shortage in the rainy season. Or in the rain season cultivated plains, tambon tha ngio tambon Nong Chang sail and tambon Huai her to be boosted agriculture continuously throughout the season of planting.
2. For use as a source of water for drinking - consuming in the dry season or during the faced problems due to the lack of water for approximately 22 suffered village. In 3 district. As mentioned above, and District nearby can help.
3. To promote the well-being of the people in the area. To benefit from the project. The company is better supported by the water. Which is the basis of productivity in agriculture, tourism, etc.
4. To increase the fertility of Forest Watershed The volume of water in the reservoir can raise the groundwater forest watershed area Constant moisture of forest resource in nature.
5 as water soil for water supply of Huai yot District in the future.
Performance:
The Department has carried out detailed survey and design project. The blessing.