In the case of horizontally curved steel I-girder bridges, girder and cross-frame members are frequently detailed for erection in the no-load condition as a matter of convention. As a result, it is imperative that the erection sequence used to construct such bridges be comprehensively studied to ensure that the no-load condition can be achieved in the field and that significant superstructure component fit-up problems do not occur. The current research investigates the erection of a recently constructed horizontally curved steel I-girder bridge, in which significant difficulties were encountered during erection. The bridge erection is recreated through an analytical simulation using a detailed nonlinear finite element model. The analytical results demonstrate that a condition that closely resembles the no-load condition can be achieved in the field during construction with the proper implementation of temporary support structures; and that the difficulties encountered during the erection of the subject bridge superstructure could not be attributed to the erection scheme followed.