delayed by an amount equal to the difference between the delay over the free float of
activity B. Specifically, given that the free float for B is 2 time units, if B is delayed by 3
time units, then E and F must be delayed by at least 3 - 2 = 1 time unit. This situation
is demonstrated in Figure 6.47.