Daily routine during the season
Time Activities
08.00 reading his rain gauge and noting the rainfall on the water allocation scheduling and monitoring report
08.00-08.30 instructing his Pump Operators gate canal and drain tenders
08.30-09.00 Inspection and/or adjustment of the water levels (F.S.L.) and gate settings of the main and lateral canal system and nothing the discharges on the water allocation scheduling and monitoring report
09.00-10.00 Inspection and/or adjustment of the discharges through the tertiary off take the water allocation scheduling and monitoring report. Meeting individual farmers on this tour.
10.00-15.00 Meeting administration reporting lunch
15.00-16.00 Inspection of the work of the pump Operators gate canal and drain tenders
16.00-17.00 Inspection of the F.S.L. levels in the laterals and the discharge into the tertiary canals and informal contact with the farmers.
Note: 1) on the weekly rest days and public holidays the activities can be restricted to only one inspection tour along the canal sections of the zone.