The Contractor shall, in consultation with the Owner’s Engineer, the Owner and its Operating Personnel and the O&M Contractor, and in accordance with the relevant Operating Manual, direct the operation of each Generating Unit after synchronization in such manner as to maximize electrical energy output and efficiency.