The requirement to formally specify the control system is a process requirement to formally specify the control system is a process requirement which is specified because formal specification and checking increases the probability that specification errors will be detected.
The second requirement above is really a security requirement which specifies that the system data areas must be checked. If these have been corrupted either by control system failure or for some other reason, then there is a potential for system error and operation should be disabled.