Regarding to R&D unit have a plan to development & issue DWG. by ourself (MMTh) begining to EL : 16MY.
Therefore Material Engineer will need to verification part and sign in order to approve.
So, I would like to inform that Material Engineer will approve in the tool drawing (After tool preparation drawing issued)