A FEED study on a third platform for Salamander-operated Bualuang field has commenced. Existing facilities at the field consist of two wellhead platforms, along with an FPSO. The floater is set to be replaced by a converted FSO vessel Suksan Salamander in August 2014. Over 60% of the conversion has been completed.