This research aims to improve the plant layout of steel flat manufacturing factory to
eliminate obstructions in material flow and thus obtain maximum productivity in relatively less
cost. The present plant layout and the operation process of each section (i.e. preheating furnace,
rough rolling, intermediate rolling, finish rolling, cutting and inspection) have been investigated.
The problem in term of processing time, stack time, distance moved, material handling cost and
processing cost of each operation section was identified. The result showed that the machine center
rough rolling, intermediate rolling, cutting machine and inspection sections should be allocated to
make the good material flow. The suitable of new plant layout can decrease the distance of material
flow, which minimize production cost.
This research aims to improve the plant layout of steel flat manufacturing factory to
eliminate obstructions in material flow and thus obtain maximum productivity in relatively less
cost. The present plant layout and the operation process of each section (i.e. preheating furnace,
rough rolling, intermediate rolling, finish rolling, cutting and inspection) have been investigated.
The problem in term of processing time, stack time, distance moved, material handling cost and
processing cost of each operation section was identified. The result showed that the machine center
rough rolling, intermediate rolling, cutting machine and inspection sections should be allocated to
make the good material flow. The suitable of new plant layout can decrease the distance of material
flow, which minimize production cost.