v4.1 Preparing Work.
4.1.1 Improve the existing soil property by compaction with smooth-wheel roller, If necessary.
4.1.2 Pour lean concrete slab for pre-cast formwork yard.
● Ensure elevation of concrete surface to smoothly and flat.
4.1.3 Fabrication steel frame of beam formwork in accordance with approved shop drawing.