After determining whether an HRU was suitable to implement LID practices, the scenarios of implementing different percentages of BMPs and LID practices were simulated from 1993 to 2010, as shown in Table 2. The baseline of the simulation (baseline or scenario 0) was when there was only retention ponds implemented in the area.