In an Oslo case
study [1], the energy consumption and the environmental impacts were evaluated for each of the components of the
UWC (WTP, water pumping, water pipelines, sewage pumping, wastewater pipelines and WWTPs). The research
analysed the system for a seven year time period - 2000 to 2006.