Nitrogen stand and 18% HCL tanker position coloured (yellow)
HNP charging line painted (blue)
Plant railing @ 2nd floor painting done (yellow & black)
Cooling tower area railing painted (yellow)
Hand rail backside plant (walkway to ct) painted (yellow)
Full railing of Staircase – all floor (backside) painted (yellow)
Two checker plate of reactor 4 & 5 painted (black)
CP storage tank top flat bar painting work done (yellow)