ptt public company limited (ptt) will execute the LPG recovery project to reduce burden of the imported LPG by improving and expanding the existing Ethane Separation plant (ESP) located inside PTT Gas Separation plant Complex in Rayong. the project will utilize the by-pass natural gas to produce the additional Ethane, Propane, LPG and NGL product and will be operated in conjunction with both existing Gas Separation Plant NO.3 and Ethane Separation Plant.
Currently, PTT is searching for a qualified Contractor who has the following past experiences:
At least one (1) completed project for Engineering, procurement, Erection, Installation, Construction and Commissioning of the major equipment (Column, Compressor and Heat Exchanger) and Electrical Substation in a live plant located inside the Gas separation Plant or petrochemical plant or Refinery plant in PTT Group Company, and the project value referred above shall be greater than 300 Million Thai Baht.
The bidding documents will be available to the Bidder's authorized representative who appears in person with original power of attorney for purchasing the bid document and original of ID card (thai) or passport (non-Thai) during business hours (09:00 - 11.00 a.m.and 1.30 - 4.00 p.m. From October 12 - October 16, 2015 and October 19 - October 20, 2015 at: