6 The Site
6.1 Acquisition of the Contractor's site
General Specifications
6.1.1 Contractor shall be responsible to acquire, provide and maintain suitable sites for
Contractor's works with solely Contractor's own expenses. Accommodation on the Site
shall be maintained in a clean, stable and secure condition. Land Acquisition
Scheduling shall be conducted solely by the Contractor The estimated dates is
available at the Employer's office for inspection. This information is for Contractor to
prepare the tender works programme only and are subject to change.
6.1.2 Works Areas are those areas intended for use by the Contractor in the construction of
the Permanent Works for site accommodation, storage, workshops and other working
space, or for access to the Works along the right of way in accordance with
Appendix 5.