Because the Cardinal Health Company needs plenty of water (7,822 cubic meters / day) is required to receive water from the Amata City settlement. This makes the high cost of water is a lot. And the Amata City settlement send not enough of water, and the demand for water will increase in the future. This is why the company need design the Zero Discharge system. To support the water needs now and in the future
e needs of the water, both now and in the future.