In order to illustrate the risk assessment method, a simulated analysis was performed. The scope included a worker, a crane (dynamic hazard), a critical edge (static hazard), and a safety supervisor.
Positions of the worker, the crane, and the safety supervisor were provided by the RTLS.
The position of the critical edge is known and constant