a situation when an air-fired CFB boiler is built prepared for conversion to CO2 capture, the ‘‘ready-to-convert’’ case, and a ‘‘new-design’’ case where a new boiler is built particularly for CO2 capture. The study attempts to catch the essential features of an oxy-fuel installation, and obvious simplifications are made to facilitate the understanding of these features rather than engaging in details of secondary importance.